HWY LYMAN ST over WATER FIRST LEVEL CANAL

AT JCT FRONT ST. · County 013, Massachusetts · Built 2022 · 2 Lanes · 4,895 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
H21018B7ADOTNBI
Year Built
2022
Length
44.6 m (146.3 ft)
Max Span
21.6 m
Width
18.3 m (60 ft)
Lanes
2
Daily Traffic
4,895
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.