US 6 MID CAPE HWY over HWY DEPOT ST

2.5 M E OF YARMOUTH TL · County 001, Massachusetts · Built 1955 · 2 Lanes · 26,354 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
H1001646TDOTNBI
Year Built
1955
Reconstructed
2003
Length
37.5 m (123 ft)
Max Span
16.5 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
26,354
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$533,000
Total Project Cost
$800,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.