ST124 PLSNT LK AVE over US 6 MID CAPE HWY

2.5 M W OF RTE 137 · County 001, Massachusetts · Built 1955 · 4 Lanes · 17,586 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
H1001349VDOTNBI
Year Built
1955
Length
39.9 m (130.9 ft)
Max Span
20.6 m
Width
16.2 m (53.1 ft)
Lanes
4
Daily Traffic
17,586
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,207,000
Total Project Cost
$6,311,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.