ST 28 MAIN ST over WATER HERRING RIVER
1.0 M W OF RTE 39 · County 001, Massachusetts · Built 1953 · 2 Lanes · 20,600 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
41.66885, -70.109383
This bridge is in worse condition than 65.4% of bridges in County 001. The average bridge in Massachusetts is 0 years old; this one is 73 years old.
Nearby Bridges
HWY LOWER COUNTY over WATER HERRING RIVER
Built 1930
HWY BELLS NCK RD over WATER HERRING RIVER
Built 1986
HWY LOWER COUNTY over WATER DOANES CREEK
Built 1955
HWY UPPER COUNTY over WATER SWAN POND RIVER
Built 2014
ST 28 MAIN ST over WATER SWAN POND RIVER
Built 2014
US 6 MID CAPE HWY over HWY DEPOT ST
Built 1955
HWY LOWER COUNTY over WATER SWAN POND RIVER
Built 1955
HWY HIGHBANK RD over WATER BASS RIVER
Built 1953
HWY AZALEA DR over WATER HERRING RIVER
Built 2024
ST134 over US 6 EB/MID CAPE HWY
Built 1969
Bridge Details
- Structure #
- H1000247QDOTNBI
- Year Built
- 1953
- Length
- 55.2 m (181.1 ft)
- Max Span
- 7 m
- Width
- 16.2 m (53.1 ft)
- Lanes
- 2
- Daily Traffic
- 20,600
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $5,890,000
- Total Project Cost
- $8,836,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.