HWY HIGHBANK RD over WATER BASS RIVER

AT BASS RIVER · County 001, Massachusetts · Built 1953 · 2 Lanes · 20,900 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
D0700541LMUNNBI
Year Built
1953
Length
62.5 m (205.1 ft)
Max Span
9.4 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
20,900
Material
Concrete Continuous
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$5,358,000
Total Project Cost
$8,038,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.