HWY UPPER COUNTY over WATER SWAN POND RIVER

.9 MI W OF RTE 28 · County 001, Massachusetts · Built 2014 · 2 Lanes · 16,552 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
D07001BAHMUNNBI
Year Built
2014
Length
27 m (88.6 ft)
Max Span
8.6 m
Width
12.4 m (40.7 ft)
Lanes
2
Daily Traffic
16,552
Material
Prestressed Concrete Continuous
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$2,389,000
Total Project Cost
$3,584,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.