ST 28 MAIN ST over WATER SWAN POND RIVER

.1 MI E OF RTE 134 · County 001, Massachusetts · Built 2014 · 2 Lanes · 9,071 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
D07006BBRDOTNBI
Year Built
2014
Length
28.5 m (93.5 ft)
Max Span
8.9 m
Width
16.7 m (54.8 ft)
Lanes
2
Daily Traffic
9,071
Material
Prestressed Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$525,000
Total Project Cost
$788,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.