ST134 over US 6 EB/MID CAPE HWY

.5 M EAST OF YARMOUTH TL · County 001, Massachusetts · Built 1969 · 3 Lanes · 18,929 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
D07009B1BDOTNBI
Year Built
1969
Reconstructed
2009
Length
39.8 m (130.6 ft)
Max Span
22.3 m
Width
16.8 m (55.1 ft)
Lanes
3
Daily Traffic
18,929
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,363,000
Total Project Cost
$6,545,000