HWY AZALEA DR over WATER HERRING RIVER

1 MI W OF ST124 · County 001, Massachusetts · Built 2024 · 2 Lanes · 646 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
H10019C61MUNNBI
Year Built
2024
Length
15.3 m (50.2 ft)
Max Span
13.1 m
Width
10.6 m (34.8 ft)
Lanes
2
Daily Traffic
646
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.