HWY RIVER ST over WATER WINNETUXET RIVER

1 MI E OF ST105 · County 023, Massachusetts · Built 1951 · 2 Lanes · 642 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
H0200743LMUNNBI
Year Built
1951
Length
17.1 m (56.1 ft)
Max Span
5.5 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
642
Material
Concrete Continuous
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,163,000
Total Project Cost
$1,745,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.