HWY CHERRY ST over WATER TAUNTON RIVER

.35 MI WEST OF WALNUT ST · County 023, Massachusetts · Built 2002 · 2 Lanes · 1,552 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
B23007AM4MUNNBI
Year Built
2002
Length
37 m (121.4 ft)
Max Span
18.5 m
Width
10.9 m (35.8 ft)
Lanes
2
Daily Traffic
1,552
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$2,842,000
Total Project Cost
$4,264,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.