ST105 THOMPSON ST over WATER WINNETUXET RIVER

AT JCT OF PRATT ST · County 023, Massachusetts · Built 1992 · 2 Lanes · 5,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
H02002420MUNNBI
Year Built
1992
Length
25.3 m (83 ft)
Max Span
5.9 m
Width
11.1 m (36.4 ft)
Lanes
2
Daily Traffic
5,500
Material
Prestressed Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,945,000
Total Project Cost
$2,918,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.