ST105 THOMPSON ST over WATER BARTLETT BROOK
.4 MI N OF MIDDLEBORO LN · County 023, Massachusetts · Built 1992 · 2 Lanes · 8,793 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
41.969539, -70.899956
This bridge is in worse condition than 32.3% of bridges in County 023. The average bridge in Massachusetts is 0 years old; this one is 34 years old.
Nearby Bridges
ST105 THOMPSON ST over WATER WINNETUXET RIVER
Built 1992
HWY RIVER ST over WATER WINNETUXET RIVER
Built 1951
HWY CHERRY ST over WATER TAUNTON RIVER
Built 2002
HWY SOUTH ST over WATER WINNETUXET RIVER
Built 1931
HWY SUMMER ST over WATER TAUNTON RIVER
Built 2011
ST104 PLYMOUTH ST over WATER TAUNTON RIVER
Built 1993
HWY MURDOCK ST over WATER NEMASKET RIVER
Built 1912
HWY POND STREET over WATER SATUCKET RIVER
Built 1850
HWY HIGH ST over WATER MATFIELD RIVER
Built 1886
HWY SUMMER ST over RR MBTA/CSX
Built 1984
Bridge Details
- Structure #
- H0200441YMUNNBI
- Year Built
- 1992
- Length
- 19.5 m (64 ft)
- Max Span
- 6.1 m
- Width
- 11.1 m (36.4 ft)
- Lanes
- 2
- Daily Traffic
- 8,793
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,496,000
- Total Project Cost
- $2,245,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.