HWY POND STREET over WATER SATUCKET RIVER

1 MI. EAST OF ST 106 · County 023, Massachusetts · Built 1850 · 2 Lanes · 2,143 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Culvert
4
Poor

Bridge Details

Structure #
E01010BVTMUNNBI
Year Built
1850
Length
6.7 m (22 ft)
Max Span
3 m
Lanes
2
Daily Traffic
2,143
Material
Steel
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$305,000
Total Project Cost
$458,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.