ST104 PLYMOUTH ST over WATER TAUNTON RIVER

1 MI S EAST BRIDGEWATER · County 023, Massachusetts · Built 1993 · 2 Lanes · 22,370 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B2301142JMUNNBI
Year Built
1993
Length
25 m (82 ft)
Max Span
23.5 m
Width
14.8 m (48.6 ft)
Lanes
2
Daily Traffic
22,370
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$446,000
Total Project Cost
$670,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.