HWY WASHNGTON ST over WATER SATUCKET RIVER

.48KM N JCT POND ST · County 023, Massachusetts · Built 1927 · 2 Lanes · 7,629 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
E0101441RMUNNBI
Year Built
1927
Length
9.4 m (30.8 ft)
Max Span
7.6 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
7,629
Material
Concrete
Design
Tee Beam
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$682,000
Total Project Cost
$1,024,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.