ST 18 BEDFORD ST over WATER FORGE POND

.25 MI N OF CENTRAL ST · County 023, Massachusetts · Built 1893 · 2 Lanes · 24,500 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
E0100347VDOTNBI
Year Built
1893
Reconstructed
1940
Length
22.3 m (73.2 ft)
Max Span
9.1 m
Width
18.7 m (61.4 ft)
Lanes
2
Daily Traffic
24,500
Material
Masonry
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,793,000
Total Project Cost
$4,190,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.