HWY SPRING ST over WATER MATFIELD RIVER

.55 MI SW RTE 18 · County 023, Massachusetts · Built 1946 · 2 Lanes · 8,146 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
E0100141QMUNNBI
Year Built
1946
Length
18.9 m (62 ft)
Max Span
6.1 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
8,146
Material
Concrete Continuous
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,468,000
Total Project Cost
$2,203,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.