HWY PLEASANT ST over WATER SALISBURY PLAIN R

.1 M S OF SUMMER ST. · County 023, Massachusetts · Built 1921 · 2 Lanes · 8,500 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
E0100741UMUNNBI
Year Built
1921
Length
10.4 m (34.1 ft)
Max Span
9.1 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
8,500
Material
Concrete
Design
Tee Beam
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$672,000
Total Project Cost
$1,009,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.