HWY PLAIN ST over RR MBTA/CSX

.25 MI E OF RTE 28 · County 023, Massachusetts · Built 1987 · 2 Lanes · 9,181 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
B250184CGDOT634
Year Built
1987
Length
24.4 m (80.1 ft)
Max Span
23.8 m
Width
16.1 m (52.8 ft)
Lanes
2
Daily Traffic
9,181
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$390,000
Total Project Cost
$586,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.