HWY PLAIN ST over WATER SALISBURY PLAIN R

AT CAMPELLO T STATION · County 023, Massachusetts · Built 1988 · 2 Lanes · 7,571 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
B2500242YMUNNBI
Year Built
1988
Length
8.9 m (29.2 ft)
Max Span
8.5 m
Width
16 m (52.5 ft)
Lanes
2
Daily Traffic
7,571
Material
Prestressed Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$169,000
Total Project Cost
$254,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.