HWY GROVE ST over RR MBTA/CSX

.1 M E OF RTE 28 · County 023, Massachusetts · Built 1977 · 2 Lanes · 8,857 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
B250154CDDOT634
Year Built
1977
Length
15.8 m (51.8 ft)
Max Span
15.2 m
Width
15.1 m (49.5 ft)
Lanes
2
Daily Traffic
8,857
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,569,000
Total Project Cost
$2,354,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.