HWY PERKINS AVE over RR MBTA/CSX

0.1 MI E OF RTE 28 · County 023, Massachusetts · Built 1895 · 2 Lanes · 6,724 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
B250174CBDOT634
Year Built
1895
Reconstructed
1999
Length
19.2 m (63 ft)
Max Span
18.7 m
Width
15.7 m (51.5 ft)
Lanes
2
Daily Traffic
6,724
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$935,000
Total Project Cost
$1,403,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.