HWY HIGH ST over RR MBTA/CSX

.7 MI EAST OF ST 28 · County 023, Massachusetts · Built 1977 · 2 Lanes · 7,759 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
B230184C8DOT634
Year Built
1977
Length
12.5 m (41 ft)
Max Span
11.9 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
7,759
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,064,000
Total Project Cost
$1,597,000