HWY SUMMER ST over WATER TAUNTON RIVER

.3 M NORTH OF RIVER ST · County 023, Massachusetts · Built 2011 · 2 Lanes · 1,214 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
B23005B6MMUNNBI
Year Built
2011
Length
34.7 m (113.8 ft)
Max Span
19.9 m
Width
10 m (32.8 ft)
Lanes
2
Daily Traffic
1,214
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$2,727,000
Total Project Cost
$4,091,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.