ST 18 BEDFORD ST over WATER TAUNTON RIVER

0.5 M. N. OF PLYMOUTH ST. · County 023, Massachusetts · Built 2007 · 2 Lanes · 23,017 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
B2300392BDOTNBI
Year Built
2007
Length
46.3 m (151.9 ft)
Max Span
22.5 m
Width
15.1 m (49.5 ft)
Lanes
2
Daily Traffic
23,017
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$660,000
Total Project Cost
$991,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.