I 495 SB over WATER TAUNTON RIVER

AT MIDDLEBORO RAYNHAM TL · County 023, Massachusetts · Built 1962 · 2 Lanes · 30,705 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
M1804147EDOTNBI
Year Built
1962
Length
51.9 m (170.3 ft)
Max Span
21.3 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
30,705
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,274,000
Total Project Cost
$6,412,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.