HWY VERNON ST over WATER TAUNTON RIVER

BWATER/MIDDLEBORO LINE · County 023, Massachusetts · Built 1956 · 2 Lanes · 1,786 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
7
Good

Bridge Details

Structure #
B2300144HMUNNBI
Year Built
1956
Length
32.3 m (106 ft)
Max Span
30.5 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
1,786
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$5,643,000
Total Project Cost
$8,465,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.