I 495 NB over WATER TAUNTON RIVER

AT MIDDLEBORO RAYNHAM TL · County 023, Massachusetts · Built 1962 · 2 Lanes · 28,714 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
M1804147CDOTNBI
Year Built
1962
Length
51.8 m (169.9 ft)
Max Span
21.3 m
Width
13.5 m (44.3 ft)
Lanes
2
Daily Traffic
28,714
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$973,000
Total Project Cost
$1,460,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.