HWY PINE ST over WATER ASSABET RIVER

1.6 KM S OF RTE 2 AND 2A · County 017, Massachusetts · Built 2009 · 2 Lanes · 6,600 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
C19019B53MUNNBI
Year Built
2009
Length
22.6 m (74.1 ft)
Max Span
22.6 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
6,600
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$2,186,000
Total Project Cost
$3,280,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.