ST 62 MAIN ST over WATER POWER CANAL

2.4 KM SW RT 2 · County 017, Massachusetts · Built 1885 · 2 Lanes · 14,400 vehicles/day

Overall
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
C190092KLDOTNBI
Year Built
1885
Reconstructed
1978
Length
7 m (23 ft)
Max Span
6.4 m
Width
18.8 m (61.7 ft)
Lanes
2
Daily Traffic
14,400
Material
Masonry
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$449,000
Total Project Cost
$674,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.