ST 62 MAIN ST over WATER ASSABET RIVER

0.32 KM SW RT 2 · County 017, Massachusetts · Built 1886 · 2 Lanes · 14,400 vehicles/day

Overall
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
C190102KKDOTNBI
Year Built
1886
Reconstructed
1902
Length
17.4 m (57.1 ft)
Max Span
17.1 m
Width
10.9 m (35.8 ft)
Lanes
2
Daily Traffic
14,400
Material
Masonry
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,599,000
Total Project Cost
$2,399,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.