ST 2 CONCORD TPK over WATER SUDBURY RIVER

2.8 KM SE RT 2 ROTARY · County 017, Massachusetts · Built 1934 · 4 Lanes · 46,700 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
C190212DTDOTNBI
Year Built
1934
Length
25.6 m (84 ft)
Max Span
25.6 m
Width
19.9 m (65.3 ft)
Lanes
4
Daily Traffic
46,700
Material
Concrete
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,359,000
Total Project Cost
$5,039,000