ST 2 CONCORD TPK over RR MBTA/BMRR
2.6 KM SE OF RTE 62 · County 017, Massachusetts · Built 1991 · 4 Lanes · 55,260 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
42.445394, -71.350733
This bridge is in worse condition than 49.9% of bridges in County 017. The average bridge in Massachusetts is 0 years old; this one is 35 years old.
Nearby Bridges
HWY SUDBURY RD over WATER SUDBURY RIVER
Built 1967
HWY CAMBRDGE TPK over WATER MILL BROOK
Built 2020
HWY NASHAWTUC RD over WATER SUDBURY RIVER
Built 1883
ST 2 CONCORD TPK over WATER SUDBURY RIVER
Built 1934
ST 62 /ST2A/MAIN over WATER SUDBURY RIVER
Built 1909
HWY ELM ST over WATER SUDBURY RIVER
Built 1874
ST126 CONCORD RD over RR MBTA/BMRR
Built 1950
HWY LOWELL RD over WATER CONCORD RIVER
Built 1964
ST 2 over HWY ACCESS ROAD
Built 2016
ST 2 CONCORD TPK over RR MBTA/BMRR
Built 1988
Bridge Details
- Structure #
- C190202DRDOTNBI
- Year Built
- 1991
- Length
- 22.6 m (74.1 ft)
- Max Span
- 21 m
- Width
- 23.5 m (77.1 ft)
- Lanes
- 4
- Daily Traffic
- 55,260
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,509,000
- Total Project Cost
- $5,264,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.