ST 2 CONCORD TPK over RR MBTA/BMRR

0.3 KM NW OF ROUTE 62 · County 017, Massachusetts · Built 1988 · 4 Lanes · 46,900 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
C190222DUDOTNBI
Year Built
1988
Length
21 m (68.9 ft)
Max Span
20.4 m
Width
23.6 m (77.4 ft)
Lanes
4
Daily Traffic
46,900
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,371,000
Total Project Cost
$5,057,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.