HWY OLD STOW RD over RR MBTA/BMRR

0.25 N RTE 62 · County 017, Massachusetts · Built 1930 · 2 Lanes · 1,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
C190142N0DOT634
Year Built
1930
Reconstructed
2014
Length
28.7 m (94.2 ft)
Max Span
9.4 m
Width
7.7 m (25.3 ft)
Lanes
2
Daily Traffic
1,500
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,671,000
Total Project Cost
$7,007,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.