ST 2 over WATER NASHOBA BROOK

0.8 KM NW RT 2 ROTARY · County 017, Massachusetts · Built 1951 · 4 Lanes · 43,300 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
C190182GRDOTNBI
Year Built
1951
Length
8.5 m (27.9 ft)
Max Span
7.6 m
Width
30.5 m (100.1 ft)
Lanes
4
Daily Traffic
43,300
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$357,000
Total Project Cost
$536,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.