HWY WETHERBEE ST over WATER NASHOBA BROOK

500 FT S OF RT 2A · County 017, Massachusetts · Built 1997 · 2 Lanes · 2,586 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
A02011257MUNNBI
Year Built
1997
Length
14.6 m (47.9 ft)
Max Span
3 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
2,586
Material
Concrete
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,448,000
Total Project Cost
$2,173,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.