HWY ELM ST over WATER SUDBURY RIVER

1.2 KM NE RT 2 & RT 62 · County 017, Massachusetts · Built 1874 · 2 Lanes · 10,086 vehicles/day

Overall
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
C190022JWDOTNBI
Year Built
1874
Reconstructed
1932
Length
25.6 m (84 ft)
Max Span
7.9 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
10,086
Material
Masonry
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,587,000
Total Project Cost
$2,381,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.