I 90 WB over I 90 EXIT 49 RAMPS
MM 49.0 ON I-90 WB · County 013, Massachusetts · Built 1957 · 2 Lanes · 25,861 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
42.169917, -72.580925
This bridge is in worse condition than 56.9% of bridges in County 013. The average bridge in Massachusetts is 0 years old; this one is 69 years old.
Nearby Bridges
I 90 EB over I 90 EXIT 49 RAMPS
Built 1957
I 90 EB over ST 33 MEMORIAL DR
Built 1957
I 90 WB over ST 33 MEMORIAL DR
Built 1957
I 90 EB over HWY MONTGOMERY ST
Built 1957
I 90 WB over HWY MONTGOMERY ST
Built 1957
I 90 EB over HWY SHERIDAN ST
Built 1957
I 90 WB over HWY SHERIDAN ST
Built 1957
I 90 WB over HWY GRANBY RD
Built 1957
I 90 EB over ST141 GRATTAN ST
Built 1957
I 90 WB over ST141 GRATTAN ST
Built 1957
Bridge Details
- Structure #
- C130524J0DOTNBI
- Year Built
- 1957
- Reconstructed
- 1994
- Length
- 18.3 m (60 ft)
- Max Span
- 16.8 m
- Width
- 13.8 m (45.3 ft)
- Lanes
- 2
- Daily Traffic
- 25,861
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,703,000
- Total Project Cost
- $2,555,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.