I 90 WB over I 90 EXIT 49 RAMPS

MM 49.0 ON I-90 WB · County 013, Massachusetts · Built 1957 · 2 Lanes · 25,861 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
C130524J0DOTNBI
Year Built
1957
Reconstructed
1994
Length
18.3 m (60 ft)
Max Span
16.8 m
Width
13.8 m (45.3 ft)
Lanes
2
Daily Traffic
25,861
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,703,000
Total Project Cost
$2,555,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.