I 90 WB over ST 33 MEMORIAL DR

MM 49.2 ON I-90 WB · County 013, Massachusetts · Built 1957 · 2 Lanes · 25,031 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
C130184HXDOTNBI
Year Built
1957
Reconstructed
1992
Length
50.6 m (166 ft)
Max Span
15.6 m
Width
17.4 m (57.1 ft)
Lanes
2
Daily Traffic
25,031
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,153,000
Total Project Cost
$1,730,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.