I 90 EB over I 90 EXIT 49 RAMPS

MM 49.0 ON I-90 EB · County 013, Massachusetts · Built 1957 · 2 Lanes · 25,192 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
C130524HYDOTNBI
Year Built
1957
Reconstructed
1994
Length
18.3 m (60 ft)
Max Span
16.8 m
Width
19.6 m (64.3 ft)
Lanes
2
Daily Traffic
25,192
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$484,000
Total Project Cost
$727,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.