I 90 WB over HWY GRANBY RD

MM 48.4 ON I90 WB · County 013, Massachusetts · Built 1957 · 2 Lanes · 60,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
C130204J3DOTNBI
Year Built
1957
Reconstructed
1995
Length
28.6 m (93.8 ft)
Max Span
26.4 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
60,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$516,000
Total Project Cost
$775,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.