I 391 over HWY MCKINSTRY AVE

1 M N JCT I-90 · County 013, Massachusetts · Built 1978 · 6 Lanes · 49,525 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
C130440WJDOTNBI
Year Built
1978
Length
27.9 m (91.5 ft)
Max Span
25.9 m
Width
33.9 m (111.2 ft)
Lanes
6
Daily Traffic
49,525
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,846,000
Total Project Cost
$8,770,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.