ST141 GRATTAN ST over RR GWRR
850 E OF INT MEADOW ST · County 013, Massachusetts · Built 1979 · 4 Lanes · 9,633 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
42.182431, -72.607758
This bridge is in worse condition than 6.5% of bridges in County 013. The average bridge in Massachusetts is 0 years old; this one is 47 years old.
Nearby Bridges
ST141 GRATTAN ST over I 391
Built 1979
I 391 & OFF RAMP over RR GWRR
Built 1979
I 391 over ST116 CHICOPEE ST
Built 1979
I 391 over WATER CONNECTICUT RIVER
Built 1979
I 391 over HWY MCKINSTRY AVE
Built 1978
HWY JACKSON ST over WATER THIRD LVL CNL SPWY
Built 1850
HWY MCKINSTRY AV over RR GWRR
Built 1993
I 391 & RAMPS ABCD over COMB MAIN ST & PVRR
Built 1980
HWY MAIN ST over WATER THIRD LEVEL CANAL
Built 1978
HWY RACE ST over WATER THIRD LEVEL CANAL
Built 1850
Bridge Details
- Structure #
- C1304613VDOT634
- Year Built
- 1979
- Length
- 16.6 m (54.5 ft)
- Max Span
- 15.1 m
- Width
- 33.5 m (109.9 ft)
- Lanes
- 4
- Daily Traffic
- 9,633
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $370,000
- Total Project Cost
- $556,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.