I 90 over I 391

MM 47.3 ON I-90 · County 013, Massachusetts · Built 1978 · 4 Lanes · 45,262 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
C130430WUDOTNBI
Year Built
1978
Reconstructed
2013
Length
61 m (200.1 ft)
Max Span
30 m
Width
27 m (88.6 ft)
Lanes
4
Daily Traffic
45,262
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,216,000
Total Project Cost
$7,825,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.