I 90 over HWY GRANGER ST

MM 46.6 ON I-90 · County 013, Massachusetts · Built 1957 · 4 Lanes · 45,385 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
C130294J8DOTNBI
Year Built
1957
Reconstructed
1994
Length
12 m (39.4 ft)
Max Span
10.7 m
Width
27.4 m (89.9 ft)
Lanes
4
Daily Traffic
45,385
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,313,000
Total Project Cost
$3,470,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.