I 90 over HWY GRANGER ST
MM 46.6 ON I-90 · County 013, Massachusetts · Built 1957 · 4 Lanes · 45,385 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
42.154144, -72.621394
This bridge is in worse condition than 56.9% of bridges in County 013. The average bridge in Massachusetts is 0 years old; this one is 69 years old.
Nearby Bridges
I 90 over WATER CONNECTICUT RIVER
Built 1957
I 90 over RR GWRR
Built 1957
I 391 NB SB RAMP over WATER N BR CHICOPEE RIV
Built 1979
I 90 over ST116 CHICOPEE ST
Built 1957
I 90 over US 5 RIVERDALE ST
Built 1957
I 391 over COMB CHIC R/STS & RLF
Built 1981
I 391 OFF RAMP CB over WATER N BR CHICOPEE RIV
Built 1979
I 391 & RAMPS over ST116 CHICOPEE ST
Built 1981
ST116 CHICOPEE ST over RR GWRR
Built 1971
HWY DEPOT ST over WATER DWIGHT MFG CANAL
Built 1997
Bridge Details
- Structure #
- C130294J8DOTNBI
- Year Built
- 1957
- Reconstructed
- 1994
- Length
- 12 m (39.4 ft)
- Max Span
- 10.7 m
- Width
- 27.4 m (89.9 ft)
- Lanes
- 4
- Daily Traffic
- 45,385
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,313,000
- Total Project Cost
- $3,470,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.