I 90 over RR GWRR

.1 MI.W.CHICOPEE ST G5 · County 013, Massachusetts · Built 1957 · 4 Lanes · 49,478 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
C130224J7DOTNBI
Year Built
1957
Length
13.6 m (44.6 ft)
Max Span
13.6 m
Width
25.8 m (84.6 ft)
Lanes
4
Daily Traffic
49,478
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$469,000
Total Project Cost
$704,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.