I 90 over ST116 CHICOPEE ST

MM 47.2 ON I-90 · County 013, Massachusetts · Built 1957 · 4 Lanes · 48,577 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
C130214J6DOTNBI
Year Built
1957
Length
25.9 m (85 ft)
Max Span
12.5 m
Width
48 m (157.5 ft)
Lanes
4
Daily Traffic
48,577
Material
Concrete Continuous
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,621,000
Total Project Cost
$2,432,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.