ST116 CHICOPEE ST over RR GWRR
.3 M N JCT I391 · County 013, Massachusetts · Built 1971 · 4 Lanes · 32,500 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
3
Serious
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 3 | Serious |
| Substructure | 6 | Satisfactory |
Location
42.15925, -72.612964
This bridge is in worse condition than 98.1% of bridges in County 013. The average bridge in Massachusetts is 0 years old; this one is 55 years old.
Nearby Bridges
I 90 over I 391
Built 1978
I 90 over ST116 CHICOPEE ST
Built 1957
I 90 over RR GWRR
Built 1957
I 391 & RAMPS over ST116 CHICOPEE ST
Built 1981
I 391 NB SB RAMP over WATER N BR CHICOPEE RIV
Built 1979
I 391 OFF RAMP CB over WATER N BR CHICOPEE RIV
Built 1979
I 90 over HWY GRANGER ST
Built 1957
ST116 SPRNGFLD ST over WATER CHICOPEE RIVER
Built 1931
I 391 over COMB CHIC R/STS & RLF
Built 1981
ST116 SPRNGFLD ST over WATER DWIGHT MFG CANAL
Built 1931
Bridge Details
- Structure #
- C1300313UDOT634
- Year Built
- 1971
- Length
- 28.9 m (94.8 ft)
- Max Span
- 27.5 m
- Width
- 21.9 m (71.9 ft)
- Lanes
- 4
- Daily Traffic
- 32,500
- Material
- Steel
- Design
- Girder and Floorbeam System
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $9,284,000
- Total Project Cost
- $13,927,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.